Applicable conditions:Road construction, agriculture, forestry and water conservancy, bridge, Quarrying and concrete, urban construction, Airport
PRODUCT PERFORMANCE
The operation efficiency of 2.0m3 large capacity bucket is increased by about 15% compared with the original 30t modelparameter name | Pc300-8m0 large earthwork specification | |||
Working weight | Kg | 33200 | ||
Rated power | kW(PS) | 187(254) | ||
Bucket capacity | M3 | 2.0 | ||
performance | Maximum walking speed | high speed | km/h | 5.5 |
Medium speed | km/h | 4.5 | ||
low speed | km/h | 3.2 | ||
Maximum digging force of bucket | KN | 227 | ||
Maximum digging force of stick | KN | 189 | ||
size | overall length | Mm | 11200 | |
Full width | Mm | 3190 | ||
Full height | Mm | 3243 | ||
Scope of work | Maximum excavation height | Mm | 9896 | |
Maximum unloading height | Mm | 6962 | ||
Maximum excavation depth | Mm | 7004 | ||
Maximum vertical excavation depth | Mm | 6090 | ||
Maximum excavation radius | Mm | 10764 | ||
Maximum excavation radius at ground level | Mm | 10569 | ||
engine | model | - | SAA6D114E-3 | |
Rated speed | RPM | 1950 | ||
displacement | Ltr | 8.27 |
QQ : 809513769
Phone : +86151-3638-1278
Tel : +860371-63770518
Email : 809513769
Add : No.8, green ring road, Huiji District, Zhengzhou City, Henan Province, China